TAP CARD TO FLIP →
START THE CONVERSATION
"Do we know where the data centre is that powers our AI tools, who owns it, and what happens to the country's banks and hospitals if it goes down?"
THIS WEEK'S CHALLENGE
Data Center Awareness
FLIP FOR THE ACTION →
THE ACTION
MEDIUMChoose digital services that run on demonstrably renewable-powered data centres. Google Cloud and Microsoft Azure publish detailed regional energy mixes; AWS is improving but lags; smaller providers like GreenGeeks, Krystal Hosting (UK), and Infomaniak (Switzerland) run on 100% renewables and say so transparently. When you use AI tools, ask the provider where their training and inference happen and how the data centre is powered, and prefer the ones that actually answer. Support proper transparency legislation: the EU's AI Act and Energy Efficiency Directive now require some disclosure; the US has nothing meaningful at federal level yet; push for it. Be aware of where the new data centres are being built. In wealthy countries: Northern Virginia (the world's densest cluster, now causing power and water strain), Ireland (data centres now consume around 21% of national electricity), the Netherlands (citizen revolts in Zeewolde and Wieringermeer), and increasingly Phoenix and the Texas desert (using millions of litres of cooling water in some of the most water-stressed regions on Earth). But the bigger build-out, and the one getting almost no Western media attention, is happening in the Global South. Johor in Malaysia has gone from almost nothing to one of Asia's largest data centre hubs in barely two years, with Microsoft, Google, ByteDance, Nvidia/YTL, and Equinix all building at scale. Indonesia (Batam, Jakarta), India (Mumbai, Hyderabad, Chennai), Mexico (Querétaro), Chile (Quilicura, where Google's expansion was paused in 2024 after community water-rights protests), and Uruguay (Canelones, where Google's project drew protest during the 2023 drought) are all on the same trajectory. Track and support local resistance where it exists. If a data centre is being proposed in your area, get involved in the planning process, ask about the energy source, water draw, heat reuse, and contribution to local grid stability before, not after, it gets built. Consider, too, whether you actually need every cloud service you use; simple data hygiene cuts demand. Ask, too, whether your country's critical services, banks, hospitals, government data, power grid control, are quietly dependent on three or four foreign hyperscalers. Sovereignty over compute is now a national-security question, not just a procurement one.
WHY IT MATTERS
Data centres already consume an estimated 1-3% of global electricity, and the explosive growth in AI training and inference is pushing that figure rapidly higher. The IEA projects data centre electricity use could double by 2026, and exceed 8% of global power by 2030. Training a single large language model can emit hundreds of tonnes of CO₂, and each user query through a generative AI tool uses roughly 10 times more electricity than a Google search. Beyond electricity, data centres consume staggering volumes of fresh water for cooling. Google's data centres alone used over 24 billion litres in 2023, much of it in already-stressed regions. They concentrate PFAS forever chemicals in their cooling systems, create urban heat islands, strain local grids, and increasingly compete directly with households for power and water. The conversation about AI and climate has been almost entirely shaped by the companies building it. Their incentive is to keep the infrastructure invisible. Refusing the invisibility is the first political move. And there's a deeper pattern to name: as wealthy countries push back on data centre power and water demands, the build-out is shifting hard into Asia, Latin America, and Africa. Malaysia is the boom town of the moment, but Indonesia, India, Mexico, Chile, and Uruguay are all on the same curve, promised jobs and 'digital transformation' in exchange for taking on the energy load, water draw, PFAS contamination, grid strain, and stranded-asset risk that richer countries are increasingly refusing. In the US, data centres are already going down because they overheat. What does that mean for facilities being built in regions projected to be too hot to live in by 2050? This is the next chapter of waste colonialism, datacenter colonialism, where the gold-rush profits flow to a handful of US tech giants and the long-tail costs are dumped on countries with less power to refuse them. None of this is inevitable. Local communities from Quilicura to Canelones to Zeewolde have already shown that organised pushback works. And the climate and water cost is only one of the risks stacking up around this infrastructure. Concentrating the world's compute in a handful of corporate data centres, most of them owned by US hyperscalers, is also a critical-infrastructure and geopolitical risk: a successful cyber-attack, a state-level fibre cut, or a single regulatory move could take down banks, hospitals, governments, and AI systems across an entire region. Anthropic's Mythos disclosure in April 2026, a frontier model that found thousands of zero-day flaws across every major operating system and browser, prompting Firefox to rewrite its security model and US banks to scramble to patch within days, made clear that AI itself is now a top-tier cyber capability. The same hyperscaler infrastructure that runs the AI is also what defends (and could be used to attack) the world's banks, grids, and hospitals. The cryptography protecting all of it has a hard expiry date too, large-scale quantum computers (work running at IBM, Google, IonQ, PsiQuantum, and China's USTC) are expected, on current trajectories, to break today's RSA and elliptic-curve encryption within roughly a decade. Adversaries are already running 'harvest now, decrypt later', hoovering up encrypted traffic today to read it the moment quantum machines mature. NIST released its first post-quantum cryptography standards in August 2024, and Apple (iMessage PQ3), Cloudflare, and Signal have started rolling out post-quantum protection, but the global infrastructure migration has barely begun. The same data-centre concentration that's straining grids and water tables is also concentrating cyber, sovereignty, and quantum risk in the same few hands.
← FLIP BACK TO DISCUSSION